Automotive
Getting PTM Corporation Back Into Production the Same Day with Urgent Feed Control Retrofit Support
Same day
Controls failed around 10:00 a.m.; the line was running again by 2:45 p.m.

Case study / Automotive
Project overview
Visionary Manufacturing Solutions supported Teijin Automotive with the installation of a new COE coil feed line designed to process higher-strength material required for a new Honda program. This was the fourth coil line Visionary helped provide for the customer, building on a strong working relationship and proven equipment performance.

Customer Challenge
Teijin Automotive’s existing Minster conventional feed line was no longer able to properly process the higher-strength material required by Honda. The customer needed a heavy-duty coil handling system that could meet the demands of the new material while fitting within their existing guarding and available floor space.
VMS Solution
Visionary provided a COE feed line package that included a 30-inch-wide servo feeder, a 350 Series 30-inch-wide straightener, and a 10,000-pound coil reel. The system was selected to support higher material strength, improve feeding performance, and integrate into the customer’s existing production environment.

Results
How our customers win
Automotive
Same day
Controls failed around 10:00 a.m.; the line was running again by 2:45 p.m.